Pursuant to Regulations 5(8), 5(8A) and 6(11) of the above Regulations, the Secretary of State hereby gives notice that, being
content that the requirements of the above Regulations have been satisfied, consent under the Petroleum Act 1998 has been
granted to the operator(s) listed below to the getting of petroleum, the drilling of a well or the construction of a pipeline.
|
DECC Ref
|
Operator
|
Project Name
|
Quad/ Block
|
Application Received
|
Direction Issued
|
| PON15B/550/0 |
Premier |
East Fyne |
21/28a-K |
24/06/2011 |
12/12/2011 |
| PON15C/339/0 |
Taqa |
Pelican |
PL1085j-P21 |
07/10/2011 |
22/12/2011 |
| PON15B/588/0 |
RWE DEA |
Clipper South |
48/19a-CCD |
14/10/2011 |
20/12/2011 |
| PON15B/590/0 |
RWE DEA |
Clipper South |
48/19a-CCB |
26/10/2011 |
23/12/2011 |
| PON15B/591/0 |
Chevron |
Captain |
13/22a-C16Y |
26/10/2011 |
01/12/2011 |
| PON15B/596/0 |
Nexen |
Ettrick |
20/2a-EICB |
10/11/2011 |
16/12/2011 |
| PON15C/351/0 |
BP |
Cats |
40/15 |
16/11/2011 |
14/12/2011 |
| PON15B/598/0 |
BP |
Magnus |
211/12a-MWA8 |
16/11/2011 |
22/12/2011 |
| PON15B/573/0 |
ConocoPhillips |
Joanne |
30/7a-MK |
12/08/2011 |
07/12/2011 |
| PON15B/583/0 |
Antrim Resources |
Carra |
21/28b-L |
09/09/2011 |
22/12/2011 |
| PON15C/349/0 |
Talisman |
Arkwright |
PL1233 |
15/11/2011 |
07/12/2011 |
| PON15B/600/0 |
ConocoPhillips |
Jasmine |
30/7a-SC |
18/11/2011 |
29/12/2011 |
| PON15C/355/0 |
Hess |
Angus |
PL1857 |
30/11/2011 |
16/12/2011 |
| PON15C/357/0 |
Shell |
Shearwater |
PL1570 |
09/12/2011 |
13/12/2011 |
Having regard to the relevant application under the above Regulations, and the representations and opinions received from
third parties, the Secretary of State has assessed the project as not likely to have a significant effect on the environment,
and has given a direction that the application for consent under the Petroleum Act 1998 need not be accompanied by an environmental
statement.
Details relating to the content of a decision, and any attached conditions; the main reasons and considerations on which the
decision is based; any representations or opinions received from third parties and how they were taken into account; and,
where necessary, any measures required to mitigate adverse effects on the environment, can be obtained by contacting the Environmental
Management Team, DECC EDU-OED, Atholl House, 86‑88 Guild Street, Aberdeen AB11 6AR (e-mail emt@decc.gsi.gov.uk). Additional
information can also be found on the DECC Oil and Gas Directorate website at https://www.og.decc.gov.uk/environment/arp.htm.